Belton Micalex 8 Pin Octal PC Mount Long Lead Socket

$ 4.49 CAD

In stock

SKU: BT-VT8-PT Category: Electronics Brand:

Description

Belton 8-pin Micalex PC mount tube socket with long leads commonly used for octal based power, preamp, and rectifier tubes.

Applicable for use with all types of electronic equipment using vacuum tubes.

Features

  • Paddle saddle mounting
  • Easy mount with the saddle of extruded screw hole
  • Phosphorous bronze pin terminal with tin plating
  • Glassfiber filled PPS Insulating material
  • Long leads
  • Convenient top or bottom mount capabilities
  • 1-1/4” chassis hole required
  • 1-1/2” oblong mounting centers
  • Body Diameter: 30 mm
  • Body Height: 14.5 mm
  • Item Height: 22.8 mm
  • Item Length: 50 mm
  • Item Width: 34 mm
  • Mounting Hole Center to Center: 40 mm
  • Mounting Hole Width: 3.5 mm

Item shown: Belton Micalex 8 Pin Octal PC Mount Long Lead Socket
: BT-VT8-PT
: 609722131810

Reviews

There are no reviews yet.

Be the first to review “Belton Micalex 8 Pin Octal PC Mount Long Lead Socket”